$LODE I got a reply. LODE was vague, but they DID say that they will have the new SK-1300 compliant report after they get the aerial survey results. BUT .... they won’t get the survey until AFTER the 3rd Qtr ER. I would think they have it in rough draft based upon their own geological survey results, but that still doesn’t come close to a concrete answer.
  • 7
7 Likes