Exchange: NASDAQ·Updated 04:20 PM EST

TRBG Turbogen Ltd

$2.81
$0.26
(8.33%)
Today
Closed $2.86
$0.05
(1.75%)
After Hours
EarningsMar 25
Mkt Cap$73.92M
Vol18,896.00

About TRBG

Turbogen Ltd. engages in development of a multi-fuel micro-turbine for local production of electricity and heat in buildings. The company was founded on May 27, 2014 and is headquartered in Petach Tikva, Israel.
41

Bearish Sentiment

How do you feel about TRBG?

TURBOGEN_IR
Defense facilities, residential buildings, and civilian infrastructure operate under different conditions. Yet each can benefit from technologies designed to generate energy closer to where it is needed. That is the opportunity TurboGen is pursuing with its TR2000. The newly assembled 20kW system uses multifuel microturbine technology designed for local electricity and heat production. Rather than limiting its development to a single application, TurboGen is targeting potential uses across both defense and civilian markets. This versatility is central to the TR2000's commercial potential. One technology platform could address different energy requirements, subject to successful testing, certification, and market adoption. With internal testing now underway, TurboGen is taking the next steps toward evaluating that opportunity. $TRBG
TURBOGEN_IR
TurboGen's latest milestone represents more than the completion of a 20kW unit. It moves the TR2000 program into internal testing, where the Company can begin evaluating the assembled system as it prepares for further development stages. The path ahead includes continued testing, anticipated certifications, and demonstrations. These steps are intended to advance the technology toward potential commercial use in defense, residential, and other civilian applications. For a technology company, commercial progress depends on moving beyond design and demonstrating that its systems can meet real-world requirements. The TR2000 has now entered an important phase of that process. $TRBG
TURBOGEN_IR
$3.4 billion. 1.7 gigawatts. AI's next big challenge is power. According to the Financial Times, has agreed to pay approximately $3.4 billion to secure existing orders for Caterpillar gas-fired generators, representing 1.7 GW of generation capacity. The message is clear: AI infrastructure expansion depends on securing the electricity needed to power it. At TurboGen, we're developing microturbines to bring electricity generation directly to the point of consumption, with heat recovery capabilities and applications including micro data centers. Different scale. A shared infrastructure challenge: getting power where it's needed. The AI race is also becoming a race for energy infrastructure. $TRBG #AIInfrastructure #DistributedEnergy https://www.reuters.com/business/energy/anthropic-secures-34-billion-generator-deal-ai-data-centers-ft-reports-2026-11-08/

Advertisement|Remove ads.